Cybersecure Energy
Digital Control Layer

The digital security layer for your energy assets.

800+ MW

Assets under control

690+ MWh

Battery storage optimised

1000+

Integrated energy assets

250+

BESS projects delivered

99.7%

Platform reliability

Security is what makes profit possible. BESSHUB is not just another monitoring platform.
This is the operational and control layer that translates, unifies, and manages your energy assets.

We don't offer passive monitoring. We build the digital infrastructure that takes full control of your energy capacity. We treat asset management as a matter of absolute security and without interruption.

INTEGRATION

A single communication layer for heterogeneous hardware. Our EMS controller translates hundreds of industrial protocols. Whatever equipment you choose, we bring it under one system.

AUTOMATION

Real-time management. The system synchronizes charge, discharge, load and export at the second level, optimizing each kilowatt according to the exchange price and forecast.

AUTONOMY

Designed for zero risk. The physical controller stores schedules locally. If possible, your facility continues to operate and earn fully autonomously for the next 30 hours.

Security

Made in Bulgaria, EU.

Multi-key access.

30 hours of autonomy in case of a breakdown.

BESSHUB: 4 steps to absolute control

In the energy sector, these four processes are managed by four separate processes and software. BESSHUB is a closed ecosystem that unites them, ensuring security and covering all market needs from the hardware itself to the sale on the energy exchange:

Stage 1: Hardware Integration and Autonomous Security (EMS Controller)

Our universal controller collects raw data directly from the machines, translating hundreds of protocols to inverters and batteries. It records energy schedules locally, guaranteeing up to 30 hours of autonomous operation of the site even in the event of a total failure.

Stage 2: External data synchronization

The system continuously receives, aggregates and synchronizes all external variables such as local meteorology, dynamic data from the energy exchange and information from external traders.

Stage 3: AI Brain and Autonomous Solutions

Artificial intelligence processes the collected internal and external data. It autonomously calculates the most profitable scenarios and makes real-time decisions on whether to sell the energy immediately, cover its own consumption, or store it in the battery.

Stage 4: Full market coverage

Ready-made commands and forecasts are distributed simultaneously to all units, covering the needs of the entire market:

  • To the machines: Direct management of the battery and inverters in the field.
  • To the merchants: Ready-made energy schedules for direct trading on the exchange.
  • To the dispatchers (SCADA): Full physical monitoring and control for technical support.

Who is
BESSHUB for

Traders

Increase trading efficiency with predictable asset behavior.

Energy companies and operators

Maximize ROI through automated optimisation strategies

Aggregators

Build scalable VPP operations with centralized control.

Property owners

Stabilize local grids with dispatchable distributed assets.

Trusted by Leading Companies

Software created from real engineering practice.

10+ years of engineering experience
Real work with photovoltaic power plants, batteries, inverters, transformers and industrial energy systems.

Own EMS controller
The physical bridge that allows software to communicate with real hardware.

R&D laboratory and test environment
New integrations and algorithms are tested before client implementation

1000+ energy systems under management
Solutions built on real objects, real data and real market conditions.

A complete energy ecosystem
Solar Home, BESS Bulgaria, Lemi Trafo and BESSHUB from physical infrastructure to software management.


Managed production facilities

800+ MW, which include photovoltaic, wind and hydroelectric power plants.


Energy storage systems

690+  MWh battery capacities are managed.


Integrated objects

The platform has integrated over 1,000 energy sites, making it one of the largest aggregators of energy assets in Bulgaria.


Forecast until the end of the year

The team expects the volume of managed assets to exceed 1 GW of production capacity and 1 GWh of battery systems.

What is hidden in the brain of BESSHUB?

BESSHUB is not a set of separate tools.
This is a single operating system in which each module has a specific role from investment simulation to daily management and financial transparency.

BESS SIM
The Investment Logic Simulator
Before you invest in more hardware, you need to know the exact math.

BESS SIM creates a digital twin of your facility by analyzing your actual consumption, production, network constraints, trading conditions, and historical exchange prices.

The result is a clear simulation: what capacity you need, how the system should be managed, and when the investment can pay off.

BESS Forecast
AI prediction and arbitrage
BESS Forecast analyzes weather data, stock prices and consumption to manage battery charging and discharging at the right time.

The system doesn't just react to the market.
She is preparing for him.

BESS SCADA
Industrial control and protection
BESS SCADA monitors inverters, batteries, devices, alarms and system status in real time.

This is the control layer that guards the infrastructure, monitors deviations, and helps problems be seen before they become a loss.

BESS VPP
Virtual power plant
BESS VPP pools assets, compensates for variances, and creates the opportunity for a more stable group schedule.

This is the next level of energy management — when many individual objects start to operate as one smart power plant.

BESS View
Financial transparency
BESS View shows produced, consumed, stored and sold energy, but translated into money.

The owner doesn't just see graphs.
He sees income, savings, reports, and returns.

BESS Charge
Monetization of surplus
When there is excess energy, the system can turn it into a new revenue stream through charging infrastructure and EV consumption.

Energy that would otherwise be wasted or sold inefficiently can be used more intelligently.

BESSHUB unlocks five streams of profit and savings. A secure system is a winning system.

Your battery is not just a storage device.
With the right operating system, it becomes a financial instrument.

1. Less purchased electricity
The system stores its own solar energy and uses it when grid energy is most expensive.

2. Arbitrage
The battery is charged at low or negative prices and sells or uses the energy during peak hours.

3. Reduction of imbalance charges
AI forecasts, schedules and active management reduce the difference between planned and actual production or consumption.

4. Reactive energy compensation
The system uses inverters to compensate for capacitive and inductive reactive energy, especially important for factories and industrial users.

5. VPP and grid services
The pooling of assets into a virtual power plant opens up the possibility of new market models, flexibility and additional revenues.

3 ENGINEERING FACTS ABOUT THE TECHNOLOGICAL ADVANTAGE OF BESS HUB

We are not just an IT company. We are engineers who build and manage critical infrastructure.


UNIVERSAL EMS CONTROLLER

Software is useless if it can't talk to the hardware. Our physical controller translates hundreds of industrial protocols. In the event of a network failure, it locally locks schedules and guarantees up to 30 hours of full autonomy for your facility.


OWN R&D LABORATORY

Your multi-million dollar asset is not a testing ground. We have a real physical lab for battery testing and balancing. Every AI algorithm undergoes a brutal engineering review with us before being deployed to your facility.


ARCHITECTURE „FROM THE UPHOLE“

Mass platforms are written by IT specialists in offices. BESSHUB is an operating system created in the field by engineers with over 1000 real-world built objects. We know the chemistry of cells and the physics of the network firsthand.

Platform capabilities

1. Grid Intelligence
  • Production forecasting (PV,load)
  • Price forecasting (DA/ID)
  • Behavioral modeling
2. Optimization Engine
  • Revenue optimisation
  • Battery strategy automation
  • Scenario simulation
3. Dispatch & Control
  • Day-ahead scheduling
  • Intraday adjustments
  • Real-time control
Инсталирана можност
512 MW
Общ капаците
201 MWh
Общ приход
€8.4M
Real Operations. Real Results.
Build for real operations - not simulations.
  • Integrated with 1000+ real assets
  • Designed for scale (GW-level)
  • Market-ready (DA / ID / balansing)
  • Build for real operations - not simulations
MARKET LAYER
Intraday Market
Balancing Market
CONTROL LAYER - BESSHUB
Optimization Engine
Dispatch Engine
ASSET LAYER
Battery Storage (BESS)
Consumers / Industry
Platform Architecture

A three-layer architecture that connects 
assets to markets throught advanced 
optimization and real-time control.

Meet Us at
Intersolar Europe, C5.319

June 22-25, 2026

Munich, Germany

Discover how BESSHUB is building the
digital control layer of the European
energy system.

Book a Meeting Request Private Demo

Live Demos

See the platform in action

Expert Discussions

Meet our team

Strategic Partnership

Build the future together

The Future Grid
Needs a Control Layer.

BESSHUB is already building it.